LAGOS, NIGERIA — The Minister of Works, Dave Umahi, has announced new measures to address persistent flooding challenges along the Lagos section of the ongoing Lagos-Calabar Coastal Highway project.
Speaking during a stakeholder engagement in Lagos, Umahi said the Federal Ministry of Works, in partnership with the Lagos State Government, would construct service lanes equipped with integrated drainage systems as part of a long-term flood management strategy.
The minister explained that the initiative is designed to improve water flow, reduce flooding risks, and protect communities along the highway corridor, particularly during periods of heavy rainfall.
He, however, disclosed that implementing the plan would require the removal of structures located within a 15-metre setback along the highway corridor to create space for the proposed infrastructure.
Beyond the long-term solution, Umahi announced immediate measures, including the clearing and desilting of blocked drainage channels and waterways affected by refuse accumulation.
He warned residents against indiscriminate dumping of waste into drainage systems, stressing that those found violating environmental regulations would face arrest and prosecution.
The minister said the interventions were necessary to protect lives, property, and the integrity of the Lagos-Calabar Coastal Highway project.
Umahi, who recently inspected sections of the corridor alongside National Assembly leaders and contractors, maintained that the highway project was not responsible for the flooding experienced in the area.
According to him, the flooding is linked to climate change and long-standing drainage challenges that require coordinated efforts between government authorities and residents.

